top of page


NATIONAL ELECTRICAL CODE

2020 NEC Code fully adopted in the state of Louisiana. All buildings permitted on or after January 1st 2023 will need to follow the 2020 NEC code. ​
2020 NEC Summaries from PEMBA Lighting for
Generator Requirements, Swimming Pool Installations, and Grounding and Bonding.
2020 National Electrical Code
Label Requirements



bottom of page